From deep utility installs to full-scale site development, our portfolio highlights the wide range of heavy civil projects we’ve delivered across Utah and beyond. These aren't just job sites—they’re proof of what experience, grit, and the right crew can accomplish. Take a look at some of our most recent and standout projects.

2023 Recycled Water Pipeline Project
Newman Construction completed the $8.43M 2023 Recycled Water Pipeline Project in Bluffdale and Draper, UT, installing 4,800+ LF of large-diameter HDPE pipelines using advanced trenchless methods including microtunneling and jack-and-bore. The project highlights our expertise in high-value water infrastructure, efficient coordination in dense corridors, and environmentally responsible construction.

Orem Heritage Park Utility Pipeline Project
Newman Construction is completing a $6.15M multi-utility pipeline project in Orem, UT, installing over 6,500 LF of large-diameter water and sewer pipelines along with extensive storm drain infrastructure and full-depth roadway reconstruction. The project highlights our expertise in managing complex, multi-utility work within congested urban environments.

TBID 24” Transmission Pipeline
Newman Construction completed a $4.47M large-diameter water pipeline project in Taylorsville, UT, installing 6,655 LF of 24” transmission main while managing complex trenching and traffic control along UDOT corridors and I-215. The project demonstrates our expertise in deep-trench and trenchless utility construction in active urban environments.

SLC Vine Street 1300 East Waterline
Newman Construction completed a $2.77M municipal waterline project on Vine Street in Salt Lake City, installing over 5,600 LF of ductile iron pipe, fire hydrants, and a 20” steel casing under a canal. The project highlights our expertise in urban utility work, maintaining service continuity in tight, high-traffic corridors.

Daybreak Village 9 Plat 5
Newman Construction completed a $3.48M residential infrastructure project in South Jordan, UT, installing over 6,500 LF of sewer, 5,800 LF of water, storm drainage, and extensive roadway and sidewalk improvements. The project highlights our expertise in master-planned community infrastructure and multi-phase utility and surface construction.

Daybreak Village 11A Plat 2
Newman Construction delivered a $4.5M subdivision project in South Jordan, UT, installing over 12,000 LF of water and sewer pipelines, 27 manholes, and more than 220,000 SF of roadway and alley grading. The project highlights our ability to integrate multi-utility systems with surface development efficiently and with consistent quality.

Daybreak Village 8 Plat 5A
Newman Construction completed a $5.12M residential infrastructure project in Daybreak, South Jordan, installing over 5,200 LF of sewer, 8,750 LF of water main, and full roadway and alleyway construction. The project showcases our expertise in turnkey subdivision delivery, managing grading, utilities, and surface work seamlessly.
Earning Respect the Right Way
We don’t chase trophies—but when industry organizations recognize our work, we’re proud to share it. These awards reflect our commitment to quality, safety, innovation, and the impact we make in the communities we serve.
Built on Trust, Backed by Results
We believe a company’s reputation is built by the people who know it best—those who hire us and those who work here. From city partners to crew members, our story is best told by the ones who’ve seen us in action. Hear what they have to say about working with Newman Construction.