300 West 200 South Roundabout — American Fork
Newman Construction completed the 300 West 200 South Roundabout in American Fork, Utah, improving traffic flow and access to the UTA FrontRunner station near I-15. The project required precise roadway grading, field-adjusted concrete elevations, and careful traffic management in a busy commuter corridor. Working closely with its concrete partner, Newman delivered a solution that reduces congestion and keeps traffic moving.

Project Overview
Newman Construction partnered with American Fork City to construct a new roundabout at 300 West and 200 South, improving traffic circulation along a key route connecting neighborhoods, businesses, and commuters to the UTA FrontRunner station.
The project included roadway excavation and grading, roundabout construction, curb and gutter improvements, and coordination of concrete elevations and roadway transitions. With significant public attention and traffic impacts throughout construction, the work demanded precision, adaptability, and close coordination with the City and project partners.
Solving Challenges in the Field
One of the project's biggest challenges involved roadway elevations and drainage slopes that did not align properly with the original construction plans. Several proposed grades created conflicts with the required curb, gutter, roadway, and roundabout concrete elevations.
Rather than allow those conflicts to stall progress, Newman worked directly with Francisco of FT Concrete to field-fit the concrete grades and transitions, developing workable solutions while maintaining the project's schedule.
The adjustments required hands-on problem-solving and precise coordination to achieve the finished roadway geometry.
Keeping a Community Moving
Construction required temporary road closures and detours, creating challenges for nearby residents and commuters. The impacts were particularly significant around Mahogany Way, where limited neighborhood access made detours especially disruptive during peak travel periods.
Newman worked through those challenges while keeping the project moving toward completion.
Now open to traffic, the roundabout replaces stop-controlled movements with a more continuous traffic pattern, helping reduce backups and improve access through this busy area.
The finished intersection also supports American Fork City's broader transportation improvements near I-15 and the FrontRunner station, including pedestrian access and roadway connectivity.
A Better Way Through American Fork
Completed October 1, 2026, the 300 West 200 South Roundabout demonstrates Newman's ability to adapt to difficult field conditions, coordinate with project partners, and deliver practical solutions under public scrutiny.
The result is an intersection designed to keep American Fork moving, with less congestion and better connectivity for the people who use it every day.
