Completion Date:
September 1, 2019
Project Owner:
Daybreak Communities
Pipeline & Utilities
Excavations & Sitework
Grading & Asphalt Paving
Earthwork

Daybreak Village 8 Plat 5A

Newman Construction completed a $5.12M residential infrastructure project in Daybreak, South Jordan, installing over 5,200 LF of sewer, 8,750 LF of water main, and full roadway and alleyway construction. The project showcases our expertise in turnkey subdivision delivery, managing grading, utilities, and surface work seamlessly.

As part of a residential expansion in Daybreak, South Jordan, this project focused on sewer, water, and road infrastructure for a large subdivision. Newman Construction installed 5,289 LF of 8” PVC sewer, with additional diameters of 10”, 12”, 15”, and 18” to accommodate varying system demands. The team also constructed 8,750 LF of culinary water main and installed over 150 lateral connections.

Full roadway and alleyway construction were included in the scope, totaling thousands of square feet of grading, base, and surfacing work. With a contract value of $5.12 million, Newman self-performed all work and completed the project on time and without disputes. Despite challenging soil conditions, all utility systems were successfully tied in and inspected.

This project exemplifies Newman Construction’s expertise in turnkey subdivision delivery. Their ability to simultaneously manage grading, utility installation, and surface works made it a model for future residential infrastructure development.

Let’s Break Ground Together

Ready to start your next project? Whether you need a bid, have questions, or want to talk shop, we’re here for it. Fill out the form and a member of our team will get back to you faster than you can say “mobilized.”

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Address
13331 S Redwood Road
Riverton, UT 84065-6109
100
+
Professionals
90
+
Years in Business
45
K+
Projects Completed