Bluffdale 14400 South Reconstruction & Utilities
Newman Construction successfully delivered the $12.45M Bluffdale 14400 South Reconstruction — installing major sewer, water, irrigation, and storm drain systems alongside full roadway paving. Completed on schedule and dispute-free, the project highlights our expertise in managing large, multi-scope civil work.

The Bluffdale 14400 South Reconstruction project is one of Newman Construction'smost ambitious and comprehensive utility infrastructure undertakings. Located in
Bluffdale, Utah, the project spans over 7,000 LF of 18” PVC sewer installation, 5,000 LF
of 12” culinary waterline, 3,100+ LF of pressurized irrigation lines, and a complete storm
drain system. Additional work included installation of 60” lined manholes, new fire
hydrants, jack and bore steel casings, utility service connections, and full roadway
reconstruction involving 325,000 SF of asphalt paving. Landscape restoration and the
removal and backfilling of a decorative pond further increased the project’s complexity.
Completed entirely by Newman Construction, the $12.45 million project was delivered
within the original schedule and with no disputes. The work showcased the company’s
ability to simultaneously manage multiple utility systems, roadway improvements, and
public coordination. Dewatering, hydrovac techniques, and intricate trenching
operations were employed to navigate varying soil conditions and ensure safety and
compliance with municipal standards.
This project positioned Newman Construction as a leader in integrated infrastructure
development. Their coordination with Bluffdale City and other agencies reinforced their
role as a trusted municipal partner, capable of leading high-value, multi-scope civil
projects that combine utility and surface work seamlessly.